Design Center & Showroom · 614 S Euclid St, Fullerton · Mon–Fri 9am–5pm

Pool Remodeling in Redondo Beach

Rough plaster, crusted waterline tile, a loud pump, and a cracked deck are the conditions behind most pool remodeling calls we get in Redondo Beach. The city appeared in the 1890 census, neighborhoods were built and rebuilt across the twentieth century, and new housing production has been tightly limited in recent decades, so many pools in North Redondo Beach, South Redondo, and Riviera Village are on their second or third finish and still running original-era equipment. Horizon coordinates resurfacing, tile and coping, decking, equipment pad work, and required safety features under one contract, planned with the rest of the yard, with pool specialty portions handled by appropriately licensed subcontractors. Properties on the beach side may also need coastal review alongside the standard permit.

Services We Offer

Equipment Upgrades

Spa Additions

Safety & Drain Covers

Our Pool Remodeling Process in Redondo Beach

Pool remodeling in Redondo Beach begins with a detailed walk-through of the pool shell, deck, equipment pad and surrounding yard so we understand exactly what is worn, what is failing and what you want the finished space to look like. Because much of the city’s housing stock ranges from older beach cottages to duplexes and fourplexes on narrow lots, the backyard footprint is often tight, and we draw the pool work in the context of that full outdoor area before anything is selected or removed. You choose the interior finish, waterline tile, coping and decking upfront, and we work through drowning prevention requirements with you so the plans are complete when they go in for review.

Permit submissions go to the City of Redondo Beach Building and Safety Division, and for properties on the beach side of the city the project may also require coastal review under the city’s Coastal Land Use Plan implementing ordinance, which we account for during the permitting process. Once approvals are in hand, the pool is drained, old tile, coping and deck are removed, and the shell is inspected closely before repair work, plumbing, equipment, electrical and gas connections proceed. Tile, coping and the new deck follow, the interior finish is applied last, and the pool is filled and carried through the start-up period the finish manufacturer specifies. Final inspection confirms all safety features are in place, and we walk you through operating the new equipment before we close out the job.

Permit processing for pool remodeling in Redondo Beach runs through the Building and Safety Division inside the Community Development Department. That is straightforward enough for most of the city, but if your property sits on the beach side, there is an added layer to plan for. That stretch falls within the California coastal zone, and Redondo Beach carries a Coastal Land Use Plan implementing ordinance in its zoning code, which means coastal review can be required on top of the standard building permit. We identify which reviews apply at the design stage, before any scope is locked in, so the schedule does not get surprised later.

Not every pool repair triggers a permit, but the common ones do: adding a spa, altering the shape or depth, structural shell work, installing a new heater, or running new gas and electrical lines. The building department makes the final call on what requires a permit, and we work that out early. When a permit is pulled for remodeling a pool or spa at a single-family home, California’s Swimming Pool Safety Act under Health and Safety Code 115922 applies. The pool must include at least two of seven listed drowning prevention features, which can include a perimeter enclosure, removable mesh fencing with a self-closing and self-latching gate, an approved safety cover, exit alarms or self-closing and self-latching devices on doors leading to the pool, or a pool alarm. The inspector confirms those features before granting final approval. Drain covers fall under the federal Virginia Graeme Baker Act, which requires anti-entrapment compliant covers on all drains, and we replace any outdated covers as part of the work.

Energy requirements show up at the equipment stage. California’s Title 20 rules require that replacement dedicated-purpose pool pump motors of 0.5 total horsepower or more, manufactured on or after July 19, 2021, be variable-speed. The 2025 California energy code also restricts the heat source for newly installed pool and spa heating, though an exception exists for alterations to pools that already have a heating system. Any new equipment, lighting, and metal near the water must also satisfy the bonding and GFCI requirements in the California Electrical Code, so a licensed electrician verifies the existing bonding grid when the deck comes up.

Draining the pool is when a full shell inspection becomes possible. Surface crazing is expected on an aging finish, but structural cracks in a gunite or shotcrete shell, or a compromised bond beam beneath the coping, get addressed before any new finish is applied, and that work is documented in a change order before it begins. Redondo Beach has been a built-out city since well before the mid-twentieth century, and many of its pools have been sitting in the ground for decades. In areas like North Redondo Beach, South Redondo, and Riviera Village, homeowner associations frequently review decking choices, fencing details, and equipment placement as well, and we coordinate that approval process alongside the building permit so both tracks move together.

Other Remodeling Services We Offer

Why Choose Horizon Remodeling For Pool Remodeling in Redondo Beach

Why Redondo Beach Homeowners Work With Horizon on Backyard Projects

Horizon Construction and Remodeling is a licensed general building contractor, bonded and active since 2009. Pool remodeling here rarely stops at the water’s edge. We handle it as part of larger backyard work that ties the pool together with decking, hardscape, patio covers, outdoor kitchens, and equipment pads, all under one contract with one project manager overseeing the build from start to finish.

Pool-specific trades work as licensed subcontractors under that same contract. That matters in a city like Redondo Beach, where the City of Redondo Beach Building and Safety Division reviews permits, and properties along the coast may also require coastal review under the city’s Coastal Land Use Plan. Coordinating every trade under one plan means new concrete or gas lines are accounted for before anything gets poured, not after.

Each proposal is written line by line, so you can see exactly what each part of the project involves and decide what to address now and what to set aside for later.

Schedule a Consultation

Clients Love

Pool Remodeling FAQ

Rectangular swimming pool with a paver deck and lounge seating
Mission Viejo, CA Bathroom Remodeling Experts - Horizon Remodeling & Construction
Pool Construction project by Horizon Construction & Remodeling
Single-story home exterior with a swimming pool, stone deck and covered patio
How do I know if my pool in Redondo Beach needs resurfacing or just a repair?

A single chipped step or a handful of loose tiles may need nothing more than a targeted repair, but a surface that is rough, stained, flaking, or sounds hollow when tapped is telling you the whole finish has run its course. Water loss beyond what evaporation accounts for is another sign worth investigating. Because Redondo Beach properties near the shoreline fall within the California coastal zone, work there can require coastal review on top of the standard building permit through the City of Redondo Beach Building and Safety Division. We look at the pool in person, and once it is drained we can determine whether any cracks are in the finish or in the shell itself, because that distinction changes the scope of what needs to be done.

Most pool remodeling projects in Redondo Beach do require a permit. Work such as adding a spa, modifying the shell, structural repairs, installing a new heater, or running new gas or electrical lines all typically require one, and the application goes through the City of Redondo Beach Building and Safety Division within the Community Development Department. A straight replaster with no other changes may not trigger that requirement. The building department makes that call, and we handle the application, plan check, and inspections either way. Permitted remodels also bring state drowning prevention requirements into the scope.

A resurfacing with new tile and coping takes a few weeks once work begins. A larger remodel, covering a new deck, equipment pad, spa addition or shell repair, runs two to three months. Design, permits and any HOA review come first, with timing driven by the City of Redondo Beach Building and Safety Division’s plan check. The interior finish has a start-up period after the fill, built into the schedule.

Pool remodeling costs in Redondo Beach start with the waterline scope, your interior finish, and the shell’s condition once drained. Equipment runs from a pump swap to a full pad with filter, heat pump, automation, and replumbing. Deck area and material, a spa addition, safety features, permit and plan check time, and coastal review for properties in the city’s coastal zone all add to the total. Our written proposal lists each item line by line.

If your pool pump motor fails, California’s Title 20 rules require any replacement dedicated-purpose pool pump motor of 0.5 total horsepower or more to be variable-speed, so that is what goes in. A variable-speed motor runs slow and long during filtration, then ramps up for a spa, cleaner, or water feature. Many Redondo Beach homeowners make that switch during a broader pool remodel, when the equipment pad is already being rebuilt anyway.

California law requires at least two of seven listed drowning prevention features on any permitted pool or spa remodel at a single-family home, things like mesh fencing with a self-closing gate, a safety cover, door exit alarms, or a pool alarm, though certain pairs do not qualify together and count as only one. In Redondo Beach, where many properties sit on narrow lots close to neighbors, the choice of which two features to install matters for both yard use and inspection approval. We work through that combination with you during design so the selection fits the way your family uses the outdoor space and satisfies the building permit issued by the City of Redondo Beach Building and Safety Division.

More Pool Remodeling Service Areas Near Redondo Beach