New Construction in Perris

New construction in Perris most commonly starts with a lot that already carries an existing structure. Given that the bulk of the city’s housing went up during the rapid growth between 1990 and 2010, many of those stucco tract homes on slabs are now at the age where a full rebuild becomes the cleaner path when the structure is too small, the foundation is tired, or adding a second story would require rebuilding most of it anyway. Smaller cottages and bungalows near the older downtown core present similar decisions. Horizon Construction and Remodeling manages new construction in Perris from the initial lot review through design, engineering, permitting with the City of Perris Building and Safety Division, demolition, and final inspection, all under one contract.

Services We Offer

Engineering & Title 24

Permits & Plan Check

New Build ADUs

Our New Construction Process in Perris

How We Approach New Construction in Perris

New construction in Perris starts with the lot, not the floor plan. We open with a zoning review, a boundary and topographic survey, and a soils report, because what the ground can support shapes every decision that follows. Structural engineering and Title 24 energy documents are prepared alongside the drawings so the plan set goes into the City of Perris Building and Safety Division complete, with fewer comments to resolve during review. If the property sits within the Downtown Perris Specific Plan area, we account for those layered development standards early, before design is finished.

Once permits issue, the build runs in order: foundation, framing, rough plumbing, electrical, mechanical, and fire sprinkler lines, then insulation, exterior finishes, and interior work. On sites where an older structure is coming down, we handle the asbestos survey and air district notification before demolition begins. One project manager stays on the job from the first shovel through the final inspection walkthrough.

Pulling permits for new construction in Perris runs through the City of Perris Building and Safety Division, which sits inside the Development Services Department. Review does not happen at a single counter. Planning checks your design against zoning requirements covering setbacks, height limits, lot coverage, and floor area. Building plan check then works through the structural drawings and energy documents, the fire department reviews sprinkler systems and site access, and public works covers grading, drainage, street trenching, and the new driveway approach. If your project is in the downtown core, the Downtown Perris Specific Plan adds its own development standards on top of the citywide zoning code, so the review process carries an extra layer that projects in May Ranch or the Villages of Avalon do not face.

Demolition requires a separate permit before the site can be cleared. Most building departments will not issue it until the gas and electric services are disconnected and the sewer lateral is capped. The South Coast AQMD, which covers most of this region, requires an asbestos survey and advance notification before demolition begins. Utility services also get resized to match the new house rather than the old one. Required fire sprinklers commonly mean a larger water meter and supply line. A bigger home with solar and modern electrical loads may need a new service from the utility entirely, and that upgrade carries its own scheduling lead time separate from the permit process.

A geotechnical report comes before foundation design can start. It identifies expansive clay, old fill, groundwater conditions, and slope stability. In state-mapped liquefaction or landslide zones, a site-specific investigation is required. The structural engineer uses those findings to size footings or design a post-tensioned slab or grade beams, then lays out shear walls, hold-downs, and beams sized for California seismic loads. On lots with grade changes, the same report drives the retaining wall design and grading plan, and the soils engineer typically signs off on footing excavations before any concrete is placed.

Energy compliance follows the 2025 Title 24 standards, which apply to permits filed on or after January 1, 2026. New single-family homes must include solar PV under those rules, and certain measures require field verification by a third-party HERS rater. If the property falls within a CAL FIRE Fire Hazard Severity Zone, wildland-urban interface standards apply: a Class A roof, ember-resistant vents, ignition-resistant exterior materials, and multipane windows with tempered glass. Inspections follow each phase of the build, from foundation forms and reinforcing steel through framing, rough-ins, and insulation, up to the final sign-off.

Other Remodeling Services We Offer

Why Choose Horizon Remodeling For New Construction in Perris

Horizon Construction and Remodeling has held an active Class B general building contractor license since 2009, and we are licensed and bonded. New construction is the largest undertaking a residential contractor handles, and we encourage you to verify our license and bond directly on the CSLB website before you commit to anything.

We work design-build, meaning design, engineering coordination, permits, and construction all fall under one contract with a single project manager. The people who drew your plans are the same people responding to plan check comments and building the house. Permit applications for new construction in Perris go through the City of Perris Building and Safety Division, and if your lot sits in the downtown core, the Downtown Perris Specific Plan adds its own development standards on top of standard citywide zoning, something we account for early. CALGreen requirements and fire sprinkler compliance are worked into the design from the start rather than appearing later as change orders.

Whether your lot is in an established neighborhood like May Ranch or Villages of Avalon, or closer to the older downtown core, we assess what the site can realistically support before anything else. Call (714) 449-9035 to schedule a free estimate.

Schedule a Consultation

Clients Love

New Construction FAQ

Irvine, CA Home Remodeling Experts - Horizon Remodeling & Construction
Bathroom double vanity with dark granite counters and framed mirrors
Entry hall detail with a wood slat feature wall and round decorative art
Bathroom double vanity with granite counters and plantation shutters
Should I rebuild or remodel my house in Perris?

Whether a rebuild or a whole home remodel makes more sense depends on the condition of the house and what the lot allows. A rebuild tends to be the right call when the foundation has serious problems, when nearly every system needs replacing and most walls are coming down anyway, when you want a second story the existing structure cannot carry, or when zoning permits a larger or better-positioned house. In neighborhoods near the downtown core, the Downtown Perris Specific Plan adds its own development standards on top of standard city zoning, which can shape what is actually buildable on a given parcel. If the structure is sound and the main goals are a new layout and updated finishes, a whole home remodel is usually simpler to permit through the City of Perris Building and Safety Division. We walk the property with you and give a straight comparison before you commit to anything.

Tearing down an existing house and building new typically requires several permits: a demolition permit for the structure coming down, a building permit for the new construction, and grading, utility, and driveway permits through public works. The City of Perris Building and Safety Division, part of the Development Services Department, reviews the plans, with planning, fire, and public works each signing off as well. Properties in the downtown core also fall under the Downtown Perris Specific Plan, which adds its own layer of development standards to the review. Sites in a fire hazard severity zone receive additional fire-code scrutiny. We prepare all submittals and manage every round of comments and resubmittals on your behalf.

Building timelines vary more than most homeowners expect, and design and permitting alone can take as long as the construction phase itself. Plan check commonly runs several months, and reviews tied to planning, fire-zone requirements, or site-specific conditions can push that further. For projects in the Downtown Perris Specific Plan area, additional development standards layer on top of the citywide code, which can add steps to the approval process. Construction of a custom home often runs close to a year, longer for larger homes or lots requiring heavy site work. Weather, utility scheduling, and inspection availability all affect the final timeline, so we give you a realistic schedule for your specific lot after the feasibility review.

Several variables drive the cost of new construction in Perris, and understanding them early keeps your budget on track. Building size and complexity matter most, particularly if the plan calls for a second story, long structural spans, or a footprint with many corners. Foundation work depends on soil conditions and how much the lot slopes, and site preparation costs, covering demolition, grading, retaining walls, and utility upgrades, shift considerably from one parcel to the next. Properties near the downtown core built during the railroad-era townsite may also fall under the Downtown Perris Specific Plan, which adds its own development standards on top of standard zoning. Finish level throughout the home affects cost significantly as well, and the City of Perris assesses impact fees and school fees tied to new square footage. We walk through each of these categories during the feasibility stage so you can see exactly where your decisions affect the number.

Yes, new homes in Perris must meet several statewide requirements, and we design to all of them from the start. The California Residential Code mandates automatic fire sprinklers in new one- and two-family homes, which affects both water service sizing and ceiling layout. Solar PV has been required on new single-family homes since the 2019 energy standards, and the 2025 Title 24 cycle adds to that for permits filed from January 1, 2026. CALGreen layers in standards for water use, construction waste recycling, indoor air quality, and EV charging readiness.

Yes, and a new build is the easiest point in the process to add an ADU or guest house. Water, sewer, and electrical service can be sized for both units at once, and the site plan can position each unit with its own entry and outdoor space. State law allows ADUs on most single-family lots, though setbacks, height, and parking rules still apply. Permits for the ADU can be pulled with the main house or as a separate project through the City of Perris Building and Safety Division.

More New Construction Service Areas Near Perris